Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for King George County.

Effective for current applications: 2021 Virginia Residential Code, 2021 Virginia Construction Code, 2021 Virginia Plumbing Code, 2021 Virginia Fuel Gas Code, 2021 Virginia Energy Conservation Code, 2021 Virginia Mechanical Code, 2020 National Electrical Code, and 2017 ICC A117.1 accessibility standard, under the Virginia Uniform Statewide Building Code.

Inspection lane

Call 540-775-7111 before 3:00 p.m. at least one day in advance and provide the permit number plus owner or contractor name. Voicemail and email requests are not honored. For a two-hour arrival window, call on the inspection day between 8:00 and 8:30 a.m. Inspections are normally performed the next working day; county-approved plans and the permit card visible from the public right-of-way must remain on site.

Minor-work playbook

Understand what may be exempt—and what is not.

The county directs applicants to Section 108.2 of the 2021 Virginia Construction Code. Exemptions include qualifying low-voltage wiring; detached one-story tool/storage sheds, playhouses, and similar accessory structures not exceeding 256 square feet; qualifying tents up to 900 square feet with fewer than 50 occupants; fences up to 7 feet unless serving as a pool barrier; low retaining walls; and ordinary cosmetic or maintenance work such as painting, wallpapering, floor finishes, cabinets and trim, and specified replacement work. Zoning and all other applicable requirements still apply.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Call 540-775-7111 before 3:00 p.m. at least one day in advance and provide the permit number plus owner or contractor name. Voicemail and email requests are not honored. For a two-hour arrival window, call on the inspection day between 8:00 and 8:30 a.m. Inspections are normally performed the next working day; county-approved plans and the permit card visible from the public right-of-way must remain on site.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for King George County

Who handles permitting for this jurisdiction?

King George County Community Development - Building Inspections is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 540-775-7111 and request the current application route before preparing a final submittal.

How long might review take?

N/A for general building-plan review. The residential packet states that approval for new County Service Authority connections takes approximately 10-14 days.

How are inspections scheduled?

Call 540-775-7111 before 3:00 p.m. at least one day in advance and provide the permit number plus owner or contractor name. Voicemail and email requests are not honored. For a two-hour arrival window, call on the inspection day between 8:00 and 8:30 a.m. Inspections are normally performed the next working day; county-approved plans and the permit card visible from the public right-of-way must remain on site.

Which codes and exemptions should I review?

Effective for current applications: 2021 Virginia Residential Code, 2021 Virginia Construction Code, 2021 Virginia Plumbing Code, 2021 Virginia Fuel Gas Code, 2021 Virginia Energy Conservation Code, 2021 Virginia Mechanical Code, 2020 National Electrical Code, and 2017 ICC A117.1 accessibility standard, under the Virginia Uniform Statewide Building Code. The county directs applicants to Section 108.2 of the 2021 Virginia Construction Code. Exemptions include qualifying low-voltage wiring; detached one-story tool/storage sheds, playhouses, and similar accessory structures not exceeding 256 square feet; qualifying tents up to 900 square feet with fewer than 50 occupants; fences up to 7 feet unless serving as a pool barrier; low retaining walls; and ordinary cosmetic or maintenance work such as painting, wallpapering, floor finishes, cabinets and trim, and specified replacement work. Zoning and all other applicable requirements still apply.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.