Digital permit application gateway

Apply for a permit in San Juan County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Ask the agency for its current review estimate

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call Planning & Building Department / inspections: 435-587-3829; county main: 435-587-3223 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for San Juan County

Who handles permitting for this jurisdiction?

San Juan County Planning & Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Planning & Building Department / inspections: 435-587-3829; county main: 435-587-3223.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call 435-587-3829 or email ccoleman@sanjuancountyut.gov to schedule, or find the existing permit in the iWorQ portal and use Request an Inspection. The portal also accepts file uploads and messages to the county. The published fee is $65 per inspection plus the State mileage rate. The county does not publish a required advance-notice interval or complete inspection-stage list on its current building page.

Which codes and exemptions should I review?

San Juan County automatically adopts the Utah State Construction and Fire Codes and future legislative amendments on their effective dates. Effective July 1, 2026, this includes the 2024 International Building Code, 2021 International Residential Code and Appendix AQ, 2024 International Plumbing Code, 2024 International Mechanical Code, 2024 International Fuel Gas Code, 2023 National Electrical Code, 2024 International Energy Conservation Code, 2024 International Existing Building Code, residential provisions of the 2024 International Swimming Pool and Spa Code, applicable Utah amendments, and the 2024 International Fire Code. County design criteria include 24-inch frost depth in Spanish Valley, Bluff, and similar locations, 36 inches elsewhere, 42 inches in mountains, 115-mph Exposure C wind load, and site-specific Utah ground snow loads. County code exempts farm buildings from a building permit unless electrical or plumbing will be installed or the structure is intended as a dwelling or for human habitation. The county's current public pages do not publish a broader county-specific list of cosmetic or minor-work exemptions; any claimed Utah-code exemption should be confirmed in writing by the Planning & Building Department before work.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.