County Permit SearchU.S. compliance directory
← Young County overview

Digital permit application gateway

Apply for a permit in Young County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

No fixed county floodplain, culvert, or inspection turnaround is published. Texas OSSF rules require approval or written denial of a complete septic application and planning materials within 30 days. No reliable local average was found.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call Harley Moore, 911 Director/Floodplain Administrator: 940-549-7911; mobile 940-327-7479 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Young County

Who handles permitting for this jurisdiction?

Young County 911 Addressing, Permitting and Public Service Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Harley Moore, 911 Director/Floodplain Administrator: 940-549-7911; mobile 940-327-7479 and request the current application route before preparing a final submittal.

How long might review take?

No fixed county floodplain, culvert, or inspection turnaround is published. Texas OSSF rules require approval or written denial of a complete septic application and planning materials within 30 days. No reliable local average was found.

How are inspections scheduled?

Submit the six-page county septic permit packet and required original Affidavit to the Public to Harley Moore at the 911 Addressing and Permitting office; call 940-549-7911 or 940-327-7479 to coordinate application review and required OSSF inspections, and obtain authorization before installation or operation. A county culvert permit must be approved and submitted by the commissioner for the applicable precinct. Contact Harley Moore for floodplain determinations and permitting before any construction in a mapped floodplain.

Which codes and exemptions should I review?

Young County publishes no countywide general structural-building permit or adopted IRC, IBC, residential electrical, plumbing, or mechanical code for unincorporated property. The county enforces its Flood Damage Prevention Ordinance amended November 24, 2008, OSSF permitting under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285, culvert approval, 911 addressing, and Subdivision Rules and Regulations. The subdivision rules require a Young County flood permit for construction in a mapped floodplain, consistency with the county flood rules, and setbacks of 50 feet from state or federal road rights-of-way and 25 feet from other roads unless an applicable municipality's ETJ setback controls. No general county building permit is published for ordinary structural, alteration, or cosmetic work in unincorporated Young County, but this does not exempt floodplain development, septic work, subdivision platting, culverts, 911 addressing, deed restrictions, or municipal/ETJ requirements. A state OSSF permit exemption may apply to a qualifying single-family residence on an undivided tract of at least 10 acres only when all site-evaluation, 100-foot separation, ownership, disposal, and nuisance conditions are met and the county confirms eligibility. Listed emergency septic repairs must be reported in writing within 72 hours after work begins.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.