Digital permit application gateway

Apply for a permit in Travis County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

The Fire Code requires issuance or denial of a complete building or system permit application within 30 days after the Fire Marshal receives the application and fee; if no action occurs in that period, the project is approved for Fire Code purposes. A requested final Fire Code inspection must begin within two business days. TNR publishes no single ordinary development-permit review target because review depends on project scope and applicant responses; technical review pauses while comments remain unanswered.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call TNR Development Services Permit Desk: 512-854-4215; TNR inspection/enforcement team: 512-854-4438; Fire Marshal: 512-854-4621 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Travis County

Who handles permitting for this jurisdiction?

Travis County Transportation and Natural Resources Development Services and Travis County Fire Marshal's Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact TNR Development Services Permit Desk: 512-854-4215; TNR inspection/enforcement team: 512-854-4438; Fire Marshal: 512-854-4621.

How long might review take?

The Fire Code requires issuance or denial of a complete building or system permit application within 30 days after the Fire Marshal receives the application and fee; if no action occurs in that period, the project is approved for Fire Code purposes. A requested final Fire Code inspection must begin within two business days. TNR publishes no single ordinary development-permit review target because review depends on project scope and applicant responses; technical review pauses while comments remain unanswered.

How are inspections scheduled?

Apply, upload plans, respond to review comments, track status, and receive TNR permits through MGO Connect. Required residential foundation, framing/mechanical, and final inspections are performed by a licensed third-party inspector and the reports are uploaded to the project account. Coordinate OSSF authorization and inspections through the same permit record and call the inspection team at 512-854-4438; do not cover or operate the system before approval. Fire Code applicants use https://www.tcfmopermits.com/ and must request final building or system inspection in writing; the Fire Marshal must begin it within two business days. County development inspectors generally require 48 hours' advance notice for construction-stage inspections identified in the online project record.

Which codes and exemptions should I review?

Travis County requires county development permits for residential and non-residential projects outside incorporated city limits, including new homes, accessory buildings, additions, renovations, fences, retaining walls, pools, solar installations, driveways, floodplain work, and OSSFs. Professional builders of new or substantially improved one- and two-family dwellings must identify the IRC edition used and submit foundation, framing/mechanical, and final third-party inspection reports under County Code Chapter 480. Effective January 1, 2026, commercial establishments, public buildings, and multifamily dwellings of more than three units must comply with the county-amended 2021 International Fire Code; the IBC is adopted by reference through Chapter 1 of that code. TNR also enforces Chapters 448 (OSSF), 464 (floodplain), and 482 (development/environmental review). Municipalities and ETJs may require additional permits. The Fire Code excludes an industrial facility with an OSHA-compliant fire brigade, and its definition of commercial establishment excludes multifamily dwellings with fewer than four units plus private garages, carports, sheds, and agricultural buildings; those projects may still require a TNR development permit. Travis County publishes permit processes even for residential remodeling without added square footage, accessory buildings, fences, pools, and rooftop solar, so applicants should not assume routine exterior or structural work is exempt. The county publishes no blanket cosmetic-work exemption. Owners repairing damage from the July 2025 flood may request a waiver of development and septic permit fees, but the permits themselves are still required.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.