Digital permit application gateway

Apply for a permit in Tom Green County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

A complete OSSF application and planning materials must be approved or denied within 30 days under the incorporated state rule. For a subdivision plat revision, one copy and supporting documents must reach the plat reviewer at least 30 days before the requested Commissioners Court meeting, and the court has 30 days to act after the application is certified complete. No separate floodplain review target is published.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call Environmental Health (OSSF, floodplain, and subdivision review): 325-658-1038 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Tom Green County

Who handles permitting for this jurisdiction?

Tom Green County Environmental Health is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Environmental Health (OSSF, floodplain, and subdivision review): 325-658-1038 and request the current application route before preparing a final submittal.

How long might review take?

A complete OSSF application and planning materials must be approved or denied within 30 days under the incorporated state rule. For a subdivision plat revision, one copy and supporting documents must reach the plat reviewer at least 30 days before the requested Commissioners Court meeting, and the court has 30 days to act after the application is certified complete. No separate floodplain review target is published.

How are inspections scheduled?

Submit the completed county OSSF application with the site evaluation, design/planning materials, installer information, and current fee to Environmental Health. Obtain authorization before installation, then call 325-658-1038 to arrange the required inspection before covering or operating the system; a permit to operate is granted only after a successful inspection showing compliance. Contact Senior Environmental Specialist and floodplain administrator Pam Weishuhn at the same office before new development or a substantial improvement in a mapped floodplain.

Which codes and exemptions should I review?

Tom Green County Environmental Health issues and inspects OSSF permits, reviews subdivisions for septic and floodplain suitability, and regulates new development and substantial improvements in mapped floodplains under its FEMA flood-damage-prevention ordinance and 44 CFR. The county is TCEQ's authorized OSSF agent and incorporates 30 TAC Chapters 30 and 285, including future amendments, through its local order. It publishes no adopted general countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition for ordinary construction outside these programs. Incorporated San Angelo and other municipalities may impose separate building and zoning requirements. Tom Green County expressly does not recognize the state 10-acre OSSF permit exclusion: every OSSF in the county's jurisdiction must be permitted and inspected by the authorized agent. The county publishes no general building-permit exemption list for ordinary cosmetic or structural work outside regulated floodplains, subdivision activity, and septic work. Development outside a mapped regulated floodplain does not require the county floodplain permit, but separate OSSF or subdivision approval may still apply.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.