Regulatory framework
The code baseline for Navarro County.
International Residential Code published as of May 1, 2008 for new single-family houses and duplexes and additions increasing an existing residence's area or value by more than 50 percent in unincorporated Navarro County; Richland-Chambers Lakeshore Area Zoning Ordinance and building-permit requirements within 5,000 feet of the reservoir's normal shoreline; county Flood Damage Prevention Court Order/NFIP standards; county OSSF rules and 30 TAC Chapter 285; county subdivision and manufactured-home-rental-community regulations.
Inspection lane
For covered residential work, the builder contracts with a qualified engineer, architect, TREC inspector, municipal plumbing/building inspector, or ICC residential-combination inspector for three inspections: foundation before concrete, framing and mechanical systems before drywall, and completion. Submit all reports before the county issues the completion certificate. For OSSF work, obtain authorization to construct, leave the system uncovered, and arrange inspection in advance with the county Designated Representative at 903-875-3313; a Notice of Approval follows a passing inspection.