Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Jeff Davis County.

The current Texas Floodplain Administrator directory lists County Judge Curtis Evans as Jeff Davis County's floodplain administrator, so development in mapped special flood hazard areas is subject to the county's NFIP floodplain review. The county website does not publish a general unincorporated-area building-permit program, zoning ordinance, adopted ICC structural-code edition, or building-inspection department. The county's FY 2026 budget continues to fund septic-tank inspections, but no current local OSSF application or adopted local order is posted; applicants should confirm jurisdiction with the County Judge. Where no locally authorized OSSF program applies, TCEQ Region 6 administers Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285.

Inspection lane

Contact County Judge/Floodplain Administrator Curtis Evans at 432-426-3968 before development in or near a mapped flood hazard area and to confirm whether the county's funded septic-inspection service applies to the site. If TCEQ has OSSF jurisdiction, submit the February 2026 TCEQ application, licensed site evaluation, planning materials, and fee to Region 6, then call 915-834-4949 to arrange the required inspection before the system is covered or operated. Use the state license lookup for evaluators, designers, installers, and maintenance providers.

Minor-work playbook

Understand what may be exempt—and what is not.

No county cosmetic-work exemption list is published because no general county building-permit program was found. Floodplain development and OSSF work are separate regulated activities and should be cleared before construction. Under state OSSF rules, a system may be permit-exempt only if every 10-acre-rule condition is met, if it is a qualifying unaltered and non-failing grandfathered system, or for defined emergency repairs reported in writing within 72 hours. Private deed restrictions and Fort Davis-area utility or subdivision requirements may apply independently.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Contact County Judge/Floodplain Administrator Curtis Evans at 432-426-3968 before development in or near a mapped flood hazard area and to confirm whether the county's funded septic-inspection service applies to the site. If TCEQ has OSSF jurisdiction, submit the February 2026 TCEQ application, licensed site evaluation, planning materials, and fee to Region 6, then call 915-834-4949 to arrange the required inspection before the system is covered or operated. Use the state license lookup for evaluators, designers, installers, and maintenance providers.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Jeff Davis County

Who handles permitting for this jurisdiction?

Jeff Davis County Judge/Floodplain Administrator; TCEQ Region 6 El Paso OSSF Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Jeff Davis County Judge/Floodplain Administrator Curtis Evans: 432-426-3968; TCEQ Region 6 El Paso: 915-834-4949.

How long might review take?

An OSSF permitting authority must approve or deny a complete application and planning materials within 30 days. Jeff Davis County publishes no typical floodplain or other development-review timeline.

How are inspections scheduled?

Contact County Judge/Floodplain Administrator Curtis Evans at 432-426-3968 before development in or near a mapped flood hazard area and to confirm whether the county's funded septic-inspection service applies to the site. If TCEQ has OSSF jurisdiction, submit the February 2026 TCEQ application, licensed site evaluation, planning materials, and fee to Region 6, then call 915-834-4949 to arrange the required inspection before the system is covered or operated. Use the state license lookup for evaluators, designers, installers, and maintenance providers.

Which codes and exemptions should I review?

The current Texas Floodplain Administrator directory lists County Judge Curtis Evans as Jeff Davis County's floodplain administrator, so development in mapped special flood hazard areas is subject to the county's NFIP floodplain review. The county website does not publish a general unincorporated-area building-permit program, zoning ordinance, adopted ICC structural-code edition, or building-inspection department. The county's FY 2026 budget continues to fund septic-tank inspections, but no current local OSSF application or adopted local order is posted; applicants should confirm jurisdiction with the County Judge. Where no locally authorized OSSF program applies, TCEQ Region 6 administers Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No county cosmetic-work exemption list is published because no general county building-permit program was found. Floodplain development and OSSF work are separate regulated activities and should be cleared before construction. Under state OSSF rules, a system may be permit-exempt only if every 10-acre-rule condition is met, if it is a qualifying unaltered and non-failing grandfathered system, or for defined emergency repairs reported in writing within 72 hours. Private deed restrictions and Fort Davis-area utility or subdivision requirements may apply independently.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.