Regulatory framework
The code baseline for Frio County.
No general Frio County ICC building-code edition was identified. The county Road & Bridge Department reviews and approves septic permits, subdivision plats, utility permits, and related floodplain documentation; OSSF work follows Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285, with Frio County infrastructure and subdivision rules applying where relevant.
Inspection lane
Have a Professional Engineer or Registered Sanitarian design the system, obtain a licensed site evaluation, prepare the legal-description/site plans and floodplain information, and obtain installer confirmation of site inspection. Return the original designs and documents to the Frio County Road & Bridge Office; the county states copies, fax submissions, and email submissions are not accepted. The packet lists residential and commercial/aerobic permit fees of $200 and $450, respectively.