Regulatory framework
The code baseline for Coffee County.
2018 International Residential Code (IRC) and 2018 IRC lumber-span charts; 2009 International Energy Conservation Code for the residential inspection guidance. Coffee County Commission Resolution 2023-M-02 adopted portions of the 2018 International Building Code. Electrical rough-ins are inspected by the State of Tennessee.
Inspection lane
Call Codes Inspector Terry Floyd at 931-723-4841 to arrange inspections. Required stages include footing before concrete, framing/rough-in after plumbing/HVAC/electrical rough-in, insulation, and final. A Certificate of Occupancy is not issued until all inspections pass; electrical rough-ins are inspected by the state. One inspection is free after the permit, then re-inspections cost $100. Permits are valid for 180 days from issuance.