Regulatory framework
The code baseline for Cheatham County.
Cheatham County’s adopted-codes page identifies the 2018 International Building Code, 2018 Residential Building Code and 2018 International Property Maintenance Code. The required-permits bulletin also references the 2018 International Swimming Pool & Spa Code. Electrical permits are issued separately by the Tennessee Department of Commerce and Insurance, and septic permits separately by Tennessee Environment and Conservation.
Inspection lane
Apply or check permit status through the official iWorQ portal; the applicant is responsible for ensuring inspections are completed. Required stages generally include footing, foundation, framing/rough-in for plumbing and mechanical, insulation and final inspection. Setback and final inspections apply to exempt accessory structures and agricultural buildings. Before final building inspection, final septic and driveway approvals are required; occupancy requires a Certificate of Occupancy. Call the Building Commission at 615-792-7915 for scheduling instructions.