Apply for a permit in Union County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

Ask the agency for its current review estimate

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 605-356-3354 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Union County

Who handles permitting for this jurisdiction?

Union County Planning and Zoning is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 605-356-3354 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call Union County Planning and Zoning at 605-356-3354 to coordinate any required inspection. The Planning Director or an authorized representative may inspect at reasonable times to enforce the ordinance or investigate a suspected violation, following lawful entry procedures. No online inspection scheduler or published staged structural-inspection sequence was found; state trade inspections are separate.

Which codes and exemptions should I review?

Union County administers its 2008 Revised Zoning Regulations, as subsequently amended, within the county's unincorporated territory. No separate county-adopted structural model-code edition was verified. For covered new nonresidential work begun after July 1, 2026 where no local structural code applies, South Dakota's statutory design baseline is the 2024 International Building Code, subject to exclusions for residential structures, manufactured/mobile homes, farmsteads, and accessory farm buildings. State electrical, plumbing, and other trade requirements remain separate. The county ordinance broadly requires a separate building permit to erect, construct, change, enlarge, alter, repair, move, improve, remove, convert, demolish, use, occupy, or maintain each regulated building, structure, or land-use change; it publishes no general cosmetic-work exemption list. The Planning Director may waive the site-plan submission when plan review is unnecessary, but this is not a permit exemption. South Dakota law prohibits requiring a permit for an owner-occupied detached single-family home's same-size repair or substantially similar replacement of a door, downspout, fascia, fence panel or post, gutter, nonstructural siding, soffit, or window, except for designated historic property.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.