Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Fall River County.

Fall River County has no general rural planning/zoning or county structural building-code program. Within a Special Flood Hazard Area, Flood Damage Prevention Ordinance 2007-1A governs development and requires flood-resistant materials and methods, anchoring, elevation or floodproofing, utilities designed to minimize flood damage, and applicable engineer or architect certifications. State plumbing and electrical permits still apply.

Inspection lane

Contact Fall River County Emergency Manager Dar Coy at 605-745-7562 for floodplain permit review, required elevation or floodproofing documentation, and any compliance verification. The ordinance requires the administrator to record lowest-floor elevations and maintain required certifications, but publishes no online inspection scheduler or routine county structural inspection sequence.

Minor-work playbook

Understand what may be exempt—and what is not.

Outside Hot Springs and Edgemont, ordinary construction outside the mapped floodplain does not require a county building permit, although new structures, additions, mobile-home moves, demolition, and unrepaired major damage must be reported to the Director of Equalization. A county development permit is required before any construction or development in a Special Flood Hazard Area, including property with a LOMA or LOMR-F. Hot Springs and Edgemont administer their own municipal permits.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Contact Fall River County Emergency Manager Dar Coy at 605-745-7562 for floodplain permit review, required elevation or floodproofing documentation, and any compliance verification. The ordinance requires the administrator to record lowest-floor elevations and maintain required certifications, but publishes no online inspection scheduler or routine county structural inspection sequence.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Fall River County

Who handles permitting for this jurisdiction?

Fall River County Emergency Management (Floodplain Administration) is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 605-745-7562 and request the current application route before preparing a final submittal.

How long might review take?

N/A. No standard floodplain permit review time is published. The ordinance defines a valid construction start as occurring within 180 days after permit issuance. The county notes that GIS staff can determine whether a site is in the floodplain, but field location work may take time when schedules are full.

How are inspections scheduled?

Contact Fall River County Emergency Manager Dar Coy at 605-745-7562 for floodplain permit review, required elevation or floodproofing documentation, and any compliance verification. The ordinance requires the administrator to record lowest-floor elevations and maintain required certifications, but publishes no online inspection scheduler or routine county structural inspection sequence.

Which codes and exemptions should I review?

Fall River County has no general rural planning/zoning or county structural building-code program. Within a Special Flood Hazard Area, Flood Damage Prevention Ordinance 2007-1A governs development and requires flood-resistant materials and methods, anchoring, elevation or floodproofing, utilities designed to minimize flood damage, and applicable engineer or architect certifications. State plumbing and electrical permits still apply. Outside Hot Springs and Edgemont, ordinary construction outside the mapped floodplain does not require a county building permit, although new structures, additions, mobile-home moves, demolition, and unrepaired major damage must be reported to the Director of Equalization. A county development permit is required before any construction or development in a Special Flood Hazard Area, including property with a LOMA or LOMR-F. Hot Springs and Edgemont administer their own municipal permits.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.