County Permit SearchU.S. compliance directory
← Union County overview

Digital permit application gateway

Apply for a permit in Union County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the Accela permitting portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Ask the agency for its current review estimate

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call Building Division: 541-962-1360 or 541-963-1224; inspection scheduling: 541-962-1317; County Planning: 541-963-1014 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Union County

Who handles permitting for this jurisdiction?

City of La Grande/Union County Building Division; Union County Planning Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Building Division: 541-962-1360 or 541-963-1224; inspection scheduling: 541-962-1317; County Planning: 541-963-1014.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call the Building Division inspection line at 541-962-1317. Permits and plan reviews can also be handled through Oregon ePermitting; the La Grande/Union County Building Division performs digital plan review and provides certified inspection services after issuance.

Which codes and exemptions should I review?

Current Oregon state specialty codes administered through the La Grande/Union County program, including the 2025 Oregon Structural Specialty Code, 2023 Oregon Residential, Electrical, and Plumbing Specialty Codes, and 2025 Mechanical and Energy-Efficiency Specialty Codes as of July 31, 2026; applicable fire, manufactured-dwelling, floodplain, sanitation, and Union County zoning requirements also apply. Limited Oregon exemptions include qualifying minor cosmetic finish work, certain low decks and patio/deck covers, fences, private slabs/driveways, and detached nonhabitable one-story accessory structures under 200 square feet and under 15 feet average roof height; trade, floodplain, septic, and zoning approvals may still be required. Union County/La Grande provides an ORS 455.315 agricultural/equine exemption for qualifying farm structures, but separate electrical, mechanical, boiler, plumbing, and septic permits may be required and conversion to non-agricultural use requires a building permit.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.