Digital permit application gateway

Apply for a permit in Multnomah County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A. Multnomah County publishes no standard 2026 turnaround for zoning/building-plan review; applications are processed after complete materials and payment, and the building-permit timeline is controlled by the responsible city.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call 503-988-3043 (Land Use Planning); the building-permit phone depends on the responsible city if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Multnomah County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 503-988-3043 (Land Use Planning); the building-permit phone depends on the responsible city.

How long might review take?

N/A. Multnomah County publishes no standard 2026 turnaround for zoning/building-plan review; applications are processed after complete materials and payment, and the building-permit timeline is controlled by the responsible city.

How are inspections scheduled?

The city issuing the building permit schedules building inspections. Multnomah County Land Use Planning handles county zoning-plan review and can self-schedule inspections for issued Geologic Hazards, Erosion and Sediment Control, or Minimal Impact Project permits through the county permit portal. Contact 503-988-3043 for rural county review questions.

Which codes and exemptions should I review?

For unincorporated Multnomah County, county enforcement includes Multnomah County Code Chapter 29 Building Regulations for non-permitted development and Chapters 38-39 land-use/zoning regulations. Actual building permits are issued by the responsible city under Oregon's current statewide specialty codes applicable in 2026, including the 2025 Oregon Structural Specialty Code, 2023 Oregon Residential/Electrical/Plumbing Specialty Codes, and 2025 Oregon Mechanical and Energy Efficiency Specialty Codes. Multnomah County states that new construction, additions, changes of use, commercial uses, and other development in unincorporated areas require county review or approval, even if a project is exempt from state building-code requirements. Limited Oregon specialty-code exemptions for ordinary maintenance, minor work, and qualifying agricultural structures may still apply, but they do not eliminate county zoning, land-use, access, floodplain, erosion-control, septic, or other approvals.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.