Digital permit application gateway

Apply for a permit in Midland County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A countywide; city and township review timelines vary. The City of Midland states zoning reviews may take up to five business days before the file moves to Building Services.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call Township Code Authority: 989-837-6521; City of Midland Building Department: 989-837-3383 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Midland County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Township Code Authority: 989-837-6521; City of Midland Building Department: 989-837-3383.

How long might review take?

N/A countywide; city and township review timelines vary. The City of Midland states zoning reviews may take up to five business days before the file moves to Building Services.

How are inspections scheduled?

For TCA-served locations, call 989-837-6521 and provide the job location and permit number; the TCA lists a building inspector at 989-313-2168 and plumbing/mechanical inspector at 989-246-4817. For City of Midland locations, contact the City Building Department at 989-837-3383. No work should be concealed before inspection, and local zoning approval is generally required before permit issuance.

Which codes and exemptions should I review?

The applicable city, township, or shared code authority enforces Michigan construction codes. Current state codes include the 2021 Michigan Building Code and 2021 Michigan Rehabilitation Code (effective April 9, 2025), 2015 Michigan Residential Code, 2021 Michigan Mechanical and Plumbing Codes (effective March 12, 2024), 2021 Michigan Commercial Energy Code (effective April 22, 2025), and 2023 Michigan Electrical Code/NEC (effective March 12, 2024). Verify the enforcing agency for the specific municipality and trade. Michigan ordinary repairs may be exempt when they do not cut or remove structural members, change required egress, or affect regulated plumbing, electrical, mechanical, or other public-safety systems. Exact exemptions vary by enforcing municipality. The state examples include certain one-story detached accessory structures up to 200 square feet, fences up to 7 feet, qualifying retaining walls, and certain sidewalks or driveways; local zoning approval may still be required.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.