Digital permit application gateway

Apply for a permit in Alpena County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A; no countywide or representative township review timeline is published.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 989-356-0297 ext. 4; Building Official Kevin Pauly 989-766-3020 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Alpena County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 989-356-0297 ext. 4; Building Official Kevin Pauly 989-766-3020.

How long might review take?

N/A; no countywide or representative township review timeline is published.

How are inspections scheduled?

The representative township application makes the applicant responsible for calling for every required inspection, including final occupancy, and for obtaining other required permits. Contact the Building Department at 989-356-0297 ext. 4; electrical inspector Andy Roznowski is listed at 989-590-9404, and mechanical/plumbing inspector Bruce Tillinger at 989-464-0985. The City of Alpena application advises 24-48 hours' advance notice for most inspections; timing may vary by municipality.

Which codes and exemptions should I review?

Current Michigan codes identified by LARA for 2026: 2021 Michigan Building Code (effective April 9, 2025); 2015 Michigan Residential Code (current code, effective February 8, 2016, with later 2021 residential rules held by court order); 2021 Michigan Rehabilitation Code; 2021 Michigan Mechanical Code; 2021 Michigan Plumbing Code; 2023 National Electrical Code/Michigan Electrical Code (effective March 12, 2024); and 2021 Michigan Commercial Energy Code (effective April 22, 2025). The representative township's application still labels the building code as 2015, so applicants should confirm the code edition applied to the permit with the local building official. Michigan code exemptions include one-story detached tool/storage sheds or playhouses up to 120 square feet, fences up to 7 feet, retaining walls up to 4 feet unless supporting a surcharge or impounding regulated liquids, grade-level water tanks up to 5,000 gallons, certain low sidewalks and driveways, painting/papering/tiling/carpeting/cabinets/countertops and similar finish work, qualifying above-ground pools under 24 inches deep, agricultural shade-cloth structures, playground equipment, qualifying window awnings, and specified movable fixtures. Ordinary repairs also remain exempt when they do not affect structural supports, egress, regulated systems, public health or general safety. Local zoning and trade-permit rules still apply.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.