Digital permit application gateway

Apply for a permit in Bossier Parish County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

The ordinance requires applications to be examined within a reasonable time and permits to be issued as soon as practicable when compliant; no fixed review period is published.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call (318) 562-3030 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Bossier Parish

Who handles permitting for this jurisdiction?

Code Inspections Plus LLC, building official and code-enforcement officer for unincorporated Bossier Parish is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (318) 562-3030.

How long might review take?

The ordinance requires applications to be examined within a reasonable time and permits to be issued as soon as practicable when compliant; no fixed review period is published.

How are inspections scheduled?

Request inspections through the My Government Online portal after obtaining the permit. The permit holder must notify the building official when work is ready; work must remain exposed and may not proceed beyond each inspection stage without approval. Final inspection is required before occupancy, and third-party reports are due to the Building Official within 3 days.

Which codes and exemptions should I review?

2021 International Residential Code, 2021 International Building Code, 2021 International Fuel Gas Code, 2021 International Mechanical Code, 2020 National Electrical Code, and 2021 International Plumbing Code. The parish ordinance exempts, among other listed work: detached accessory structures without utilities up to 200 square feet; fences up to 6 feet; retaining walls up to 4 feet unless supporting surcharge; grade-supported water tanks up to 5,000 gallons; sidewalks and driveways; painting, papering, tiling, carpeting, cabinets, countertops and similar finish work; shallow prefabricated pools under 24 inches; playground equipment; qualifying window awnings; minor electrical repairs; portable gas/mechanical appliances; certain minor plumbing repairs and stoppage clearing; ordinary repairs that do not affect structure, egress, utilities, wiring, or public safety.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.