County Permit SearchU.S. compliance directory
← Monroe County overview

Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Monroe County.

The county program operates under the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 International Building and Residential Codes with Kentucky amendments. Trade work remains subject to Kentucky electrical, plumbing, HVAC, elevator, manufactured-housing, and boiler requirements. No newer Monroe County-specific 2026 code adoption was verified.

Inspection lane

Schedule building inspections directly with Local Building Inspector Howard Stuart at 270-634-4135. The DHBC roster directs electrical applicants to the Monroe County Judge Executive's office or the city office where work occurs. HVAC inspector Charles Stovall: 606-622-3560; state building inspector Dale Henderson: 270-849-7409; plumbing inspector Brandon Smith: 270-975-1839, with Wednesday 8:00-9:00 a.m. office hours at Monroe County Health Department, 452 East 4th Street, Tompkinsville; elevator inspector Benjamin Pennington: 502-234-8725; manufactured housing inspector Rodney Farrar: 270-404-5327; boiler inspector David Miller: 606-594-8146.

Minor-work playbook

Understand what may be exempt—and what is not.

N/A. No Monroe County-specific list of minor or cosmetic building-permit exemptions was published on the verified official pages. Confirm whether a proposed repair or accessory structure is exempt with Howard Stuart before starting work.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Schedule building inspections directly with Local Building Inspector Howard Stuart at 270-634-4135. The DHBC roster directs electrical applicants to the Monroe County Judge Executive's office or the city office where work occurs. HVAC inspector Charles Stovall: 606-622-3560; state building inspector Dale Henderson: 270-849-7409; plumbing inspector Brandon Smith: 270-975-1839, with Wednesday 8:00-9:00 a.m. office hours at Monroe County Health Department, 452 East 4th Street, Tompkinsville; elevator inspector Benjamin Pennington: 502-234-8725; manufactured housing inspector Rodney Farrar: 270-404-5327; boiler inspector David Miller: 606-594-8146.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

No verified planning reference link is listed; ask the agency for the parcel-specific source.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Monroe County

Who handles permitting for this jurisdiction?

Monroe County Building Inspection Program / Monroe County Fiscal Court is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Local Building Inspector Howard Stuart: 270-634-4135, howstuart@scrtc.com; Monroe County Fiscal Court/Judge Executive: 270-487-5505; state Building Inspector Dale Henderson: 270-849-7409; Health Department/plumbing office: 270-487-6782.

How long might review take?

N/A. No Monroe County review timeline was published; confirm expected review time directly with the local building inspector.

How are inspections scheduled?

Schedule building inspections directly with Local Building Inspector Howard Stuart at 270-634-4135. The DHBC roster directs electrical applicants to the Monroe County Judge Executive's office or the city office where work occurs. HVAC inspector Charles Stovall: 606-622-3560; state building inspector Dale Henderson: 270-849-7409; plumbing inspector Brandon Smith: 270-975-1839, with Wednesday 8:00-9:00 a.m. office hours at Monroe County Health Department, 452 East 4th Street, Tompkinsville; elevator inspector Benjamin Pennington: 502-234-8725; manufactured housing inspector Rodney Farrar: 270-404-5327; boiler inspector David Miller: 606-594-8146.

Which codes and exemptions should I review?

The county program operates under the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 International Building and Residential Codes with Kentucky amendments. Trade work remains subject to Kentucky electrical, plumbing, HVAC, elevator, manufactured-housing, and boiler requirements. No newer Monroe County-specific 2026 code adoption was verified. N/A. No Monroe County-specific list of minor or cosmetic building-permit exemptions was published on the verified official pages. Confirm whether a proposed repair or accessory structure is exempt with Howard Stuart before starting work.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.