County Permit SearchU.S. compliance directory
← Menifee County overview

Digital permit application gateway

Apply for a permit in Menifee County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the SmartGov public portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A. No current state or county plan-review turnaround time was published for Menifee County.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call State Building Inspector Wade Trimble: 606-359-6397; Menifee County Judge Executive: 606-768-3482; Menifee County Health Department/plumbing office: 606-768-2190. if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Menifee County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact State Building Inspector Wade Trimble: 606-359-6397; Menifee County Judge Executive: 606-768-3482; Menifee County Health Department/plumbing office: 606-768-2190..

How long might review take?

N/A. No current state or county plan-review turnaround time was published for Menifee County.

How are inspections scheduled?

For commercial building permits and state building inspections, contact DHBC State Building Inspector Wade Trimble at 606-359-6397 or wade.trimble@ky.gov and use the SmartGov public portal. State electrical inspector Darryl Morgan: 859-473-5176; HVAC inspector Charles Ray Moore: 606-671-7127; manufactured housing inspector Brandon Miller: 606-585-3168; elevator inspector Dan Stifle: 606-748-9337; boiler inspector Scott Shepherd: 502-382-0545. Plumbing inspector Roy 'Gordon' Vanhoose is available Monday 8:00-9:00 a.m. at 606-768-2190, Menifee County Health Department, 1919 Main Street, Frenchburg.

Which codes and exemptions should I review?

The current DHBC assignment lists no local building inspector and directs commercial building permits to the state. DHBC administers the Kentucky Building Code and Kentucky Residential Code, with applicable Kentucky amendments and state trade codes; no county-specific 2026 code adoption was verified. No Menifee County-specific minor or cosmetic exemption list was published on the verified county or DHBC pages. The state code's limited exemptions should be confirmed with DHBC before work; electrical work should be coordinated with the county judge executive or the city office where the work occurs.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.