County Permit SearchU.S. compliance directory
← Marion County overview

Digital permit application gateway

Apply for a permit in Marion County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the SmartGov public portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A. No current county or state plan-review turnaround time was published for Marion County.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call State Building Inspector Dale Henderson: 502-489-7409; Marion County Judge Executive: 270-692-3451; City of Lebanon building/planning office: 270-692-6272; Marion County Health Department/plumbing office: 270-692-0200. if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Marion County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact State Building Inspector Dale Henderson: 502-489-7409; Marion County Judge Executive: 270-692-3451; City of Lebanon building/planning office: 270-692-6272; Marion County Health Department/plumbing office: 270-692-0200..

How long might review take?

N/A. No current county or state plan-review turnaround time was published for Marion County.

How are inspections scheduled?

For county/state building inspections, contact DHBC State Building Inspector Dale Henderson at 502-489-7409 and use the SmartGov public portal. State electrical inspector Don Cravens: 606-391-5531; HVAC inspector Jason DeMurray: 270-283-1042; manufactured housing inspector Carl Lee: 270-283-8297; elevator inspector John Pennington: 502-226-0124; boiler inspector Ben Tate: 502-604-5072. Plumbing inspector John Willis is available Thursday 8:00-9:30 a.m. at 270-692-0200, Marion County Health Department, 516 North Spalding, Lebanon. For Lebanon municipal work, contact the city building/planning office at 270-692-6272.

Which codes and exemptions should I review?

For the county-level pathway, the current DHBC assignment routes building-code work to state inspector Dale Henderson. DHBC administers the Kentucky Building Code and Kentucky Residential Code with applicable Kentucky amendments and state trade codes; no county-specific 2026 adoption was verified. The City of Lebanon separately reports using the 2018 International Building Code with 2018 Kentucky amendments. No Marion County-specific minor or cosmetic exemption list was published on the verified county or DHBC pages. The state code's limited exemptions should be confirmed with DHBC before work. Municipal rules may differ; Lebanon's planning office reviews building plans for zoning compliance and should be contacted for work inside Lebanon.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.