Who handles permitting for this jurisdiction?+
Metropolitan Area Building and Construction Department (MABCD), Sedgwick County / City of Wichita joint permitting authority is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.
How should I begin an application?+
Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 316-660-1840; inspection scheduling IVR 316-660-9550.
How long might review take?+
Residential plan review is generally handled with the permit writer and the county says to plan on about one hour for review and permit issuance when the submission is complete. Published MABCD commercial review guidelines are approximately 5 business days for projects valued at $35,000 or less, 8 days for $35,001-$100,000, 13 for $100,001-$325,000, 18 for $325,001-$3,000,000, 25 for $3,000,001-$10,000,000, and 30 for projects over $10,000,000; revision reviews are approximately 3, 4, 7, 9, 13, and 15 business days respectively. These are guidelines and can vary with backlog and completeness.
How are inspections scheduled?+
After permit issuance, the permit holder is responsible for scheduling and passing required inspections through the MABCD Portal or the IVR/Telus system at 316-660-9550. MABCD’s inspection contacts include general construction/building, electrical/elevator, mechanical, plumbing, floodplain, and wastewater/well staff. Commercial plans are submitted electronically through ePlans; residential applicants provide legal description, PIN, and site plan and may use the portal or an appointment.
Which codes and exemptions should I review?+
Current adopted codes listed by Sedgwick County include the 2024 International Building Code and 2024 International Existing Building Code, 2018 International Residential Code, 2018 International Fire Code for the county and city, 2023 National Electrical Code, 2022 ASME A17.1, 2017 ASME A18.1, 2015 ASME A17.3, 2024 International Mechanical Code, 2024 International Fuel Gas Code, and 2021 Uniform Plumbing Code/International Fuel Gas Code, all as amended. MABCD states that the 2024 IBC and IEBC began enforcement for commercial plans on January 1, 2025. Exemptions do not authorize work that violates other laws or ordinances. For Sedgwick County jurisdiction, one-story detached accessory structures classified as Group S or U may be exempt from a building permit when the floor area is no more than 400 square feet, the site is not in a designated floodplain, and required anchoring/site conditions are met; Wichita has a 200-square-foot limit plus a location permit. Existing finish work such as paint, wallpaper, tiling, carpeting, cabinets, countertops, paneling, and similar work generally does not require a permit. New construction, additions, and changes do require one; confirm edge cases with MABCD.