County Permit SearchU.S. compliance directory
← Union County overview

Digital permit application gateway

Apply for a permit in Union County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

N/A. Union County does not publish a countywide building-permit timeline; municipal review times vary. Creston directs applicants to its Building and Code Compliance Department for current processing information.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 641-782-2000 option 3 (Creston Public Works/Building); 641-782-7803 (Union County Environmental Health) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Union County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 641-782-2000 option 3 (Creston Public Works/Building); 641-782-7803 (Union County Environmental Health).

How long might review take?

N/A. Union County does not publish a countywide building-permit timeline; municipal review times vary. Creston directs applicants to its Building and Code Compliance Department for current processing information.

How are inspections scheduled?

For property in Creston, contact Public Works at 641-782-2000 option 3 or the building inspector at 515-850-2980; the City issues and schedules local inspections. For other municipalities, contact the relevant city clerk/building official. County septic, well, and environmental-health inspections are handled by Union County Environmental Health at 705 E. Taylor Street, Creston, 641-782-7803, 8:30 a.m.-4:00 p.m. weekdays.

Which codes and exemptions should I review?

Union County's official department directory does not list a county zoning or general building department, and its ordinances page lists no general county building-code or zoning ordinance. Building permits and inspections therefore fall back to the applicable municipality; Creston's official Building and Code Compliance Department handles construction permits, building codes, inspections, zoning questions, and related approvals within Creston. Countywide environmental-health rules cover septic systems, wells, wastewater, and related public-health matters. Union County separately regulates flood plains, wind/solar facilities, airport height, agricultural-area applications, and certain roads/utilities. No countywide building-permit exemption list was published because Union County does not operate a general county building-permit program. In the principal municipal fallback, Creston says a one-story detached accessory shed/playhouse/tool or storage structure up to 200 square feet may not need a permit if setbacks are met; an above-ground swimming pool may not need a permit, subject to setbacks and barrier rules. Creston requires permits for new buildings, structural changes, major residential remodels, commercial/industrial remodeling, attached decks, and detached decks over 30 inches high or 120 square feet. Other Union County municipalities may differ.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.