Fees, valuation & enforcement

Know the cost of authorization—and the cost of skipping it.

Permit fees are a project input. Enforcement exposure is a project risk. Use the official schedule where available, then confirm valuation, trade permits, plan review, and inspection charges with the Authority Having Jurisdiction.

Official fee pathway

Build the permit budget from the issuing agency’s schedule.

The final charge may depend on declared construction value, occupancy classification, square footage, plan review, state surcharges, trade permits, technology fees, and inspection activity. Do not use a neighboring city’s fee table as a substitute for this jurisdiction.

Fee desk contact

319-753-4313; Assistant Land Use Administrator 319-753-4321

Ask the counter to confirm current charges before submitting a project with multiple trades or a change of use.

Financial exposure

Budget for the complete approval path.

Plan for building, mechanical, plumbing, electrical, fire, energy, zoning, septic, right-of-way, or other reviews that the project scope triggers. The lowest initial permit fee is not always the lowest project cost.

Enforcement exposure

Stop-work authority can interrupt the critical path.

When work begins without authorization, the agency may halt the site, require corrective plans, impose additional fees, withhold inspection release, or require concealed work to be exposed for review.

Closeout exposure

Unresolved work can block occupancy and utilities.

A missing final inspection or certificate can complicate occupancy, refinancing, sale, insurance, and utility connection. Preserve the approved plans and signed inspection record through closeout.

Professional field note

Treat every exemption as a narrow code exception, not a blanket waiver.

Even when a cosmetic or minor project does not require a building permit, zoning, floodplain, shoreline, historic, utility, fire, or right-of-way controls may still apply. Confirm the full jurisdictional picture before work starts.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Des Moines County

Who handles permitting for this jurisdiction?

Des Moines County Land Use Department (administered by Southeast Iowa Regional Planning Commission) is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 319-753-4313; Assistant Land Use Administrator 319-753-4321 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the reviewed county materials do not publish a general zoning-permit review or issuance timeline. Approved construction must begin within six months and be completed within one year; permits can expire after those periods, subject to any approved extension.

How are inspections scheduled?

Submit the zoning/special-use application with a site plan, applicable building floor plan, non-refundable fee, and any required floodplain, airport-height, entrance, well/septic, or erosion-control permits. The applicant should contact the Land Use Administrator when construction is complete; no separate routine building-inspection program is published by the county. Floodplain and zoning inspections or compliance questions go to the Land Use Department at 319-753-4313; well/septic permits are through Des Moines County Health at 319-753-8217, and county-road entrances through Secondary Roads at 319-753-8241.

Which codes and exemptions should I review?

Des Moines County Land Use Department administers county zoning, floodplain, subdivision, airport-height, and related land-use ordinances in the limited county zoning jurisdiction within 2 miles of Burlington. Zoning districts are A-1, R-1, R-1A, R-2, C-1, I-1, PUD, and FP. A current Floodplain Development Ordinance No. 25 was adopted April 21, 2026 and effective May 26, 2026; it incorporates current FEMA flood maps, including May 26, 2026 panels, and requires floodplain development permits and flood-resistant construction standards. The county land-use program is not a general technical building-code inspection program; applicable Iowa State Building Code, electrical, plumbing, mechanical, health, septic, and municipal requirements also apply. Agricultural uses, farmsteads, farm barns, farm outbuildings, and structures primarily adapted for agricultural purposes are exempt from the county zoning ordinance, subject to the ordinance's agricultural-use conditions; floodplain requirements may still apply. Other zoning-permit exemptions include accessory buildings under 175 square feet, full or partial demolition/removal, essential services, roof-mounted solar panels, and temporary construction buildings. The current floodplain ordinance also excludes minor projects under $500 from the definition of development and exempts routine maintenance such as reroofing, siding, painting, finish work, basement sealing, window-pane repairs, plumbing/electrical/HVAC repairs, and well/septic repairs. No county technical building-code exemption list was found.

Why permit costs vary

The fee is tied to the work, not just the form.

Building departments commonly calculate charges from valuation, occupancy, floor area, project type, plan review effort, trade scope, state surcharges, and inspection activity. A remodel that appears small on paper may still trigger structural, energy, fire, or utility review. Ask the permit counter which disciplines apply before you finalize the construction budget.

The same discipline applies to enforcement. Correcting unpermitted work after finishes are installed can require demolition, revised plans, additional inspections, and schedule disruption. Authorization is usually the less expensive project-management decision.