Apply for a permit in Dallas County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Complete building permit applications are generally reviewed in up to 10 business days in order received; incomplete applications are returned and cannot proceed. Construction must commence within six months and be completed within 12 months of permit issuance unless an extension is approved. Certificate of Zoning Compliance documents state that the certificate is void if work has not commenced within six months and proposed construction or alteration must be completed within 18 months.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 515-993-5819 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Dallas County

Who handles permitting for this jurisdiction?

Dallas County Planning and Development is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 515-993-5819.

How long might review take?

Complete building permit applications are generally reviewed in up to 10 business days in order received; incomplete applications are returned and cannot proceed. Construction must commence within six months and be completed within 12 months of permit issuance unless an extension is approved. Certificate of Zoning Compliance documents state that the certificate is void if work has not commenced within six months and proposed construction or alteration must be completed within 18 months.

How are inspections scheduled?

Submit the building permit application by email, mail, or in person after providing a scaled site plan, construction plans, applicable septic and entrance permits, and required sub-permits. Inspection requests must be emailed to the Building Inspector, not phoned in, at least 24 hours in advance and preferably 48 hours. Required stages include footing, foundation, under-slab, rough-in, and final inspection before occupancy; covered work may have to be exposed for inspection. The county also requires a final Certificate of Occupancy before use.

Which codes and exemptions should I review?

Dallas County's Chapter 47 Uniform Construction Codes Ordinance, Chapter 45 Zoning Ordinance for the unincorporated areas, Chapter 40 Floodplain Management Ordinance, Chapter 42 Subdivision Regulations, Chapter 41 Perry Airport Ordinance, and Chapter 48 Small Wind Energy Conversion Systems Ordinance apply in unincorporated areas. The county's 2026 amendment requires passive radon control methods under Appendix AF of the 2021 International Residential Code for new single-family and two-family homes; Chapter 47 also incorporates county amendments to the International codes and Iowa requirements. Applicable electrical, plumbing, mechanical, septic, floodplain, and state requirements also apply. Agricultural exemption applications may exempt farmhouses and farm buildings primarily adapted for agricultural use while so used or under construction for that use, as well as animal feeding operations and qualifying structures under Iowa Code; the exemption requires Director approval and ends if the building is used for a non-agricultural purpose. The county's general building permit process applies to all other structures, including pools and ground-mounted solar. No broad minor or cosmetic exemption list was published.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.