Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Madison County.

N/A for a specific 2026 edition; the county administers planning and building permits in unincorporated Madison County and applies applicable Indiana building-code and county development requirements.

Inspection lane

Submit all required documents through the iWorQ portal, including plans, a scaled site plan, elevations, and applicable driveway/septic/sewer documentation. The county contacts applicants when review is complete; contact the planning office for inspection instructions.

Minor-work playbook

Understand what may be exempt—and what is not.

The fee schedule expressly lists accessory structures over 121 square feet as permit items; the reviewed official materials do not publish a complete minor/cosmetic exemption list. The county serves unincorporated areas and the Town of Orestes as its building commission jurisdiction.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Submit all required documents through the iWorQ portal, including plans, a scaled site plan, elevations, and applicable driveway/septic/sewer documentation. The county contacts applicants when review is complete; contact the planning office for inspection instructions.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Madison County

Who handles permitting for this jurisdiction?

Madison County Planning Commission is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 765-641-9540; driveway permit inquiries 765-641-9544.

How long might review take?

Normally 7-10 business days after all required documentation is submitted; payment is due when the permit is issued.

How are inspections scheduled?

Submit all required documents through the iWorQ portal, including plans, a scaled site plan, elevations, and applicable driveway/septic/sewer documentation. The county contacts applicants when review is complete; contact the planning office for inspection instructions.

Which codes and exemptions should I review?

N/A for a specific 2026 edition; the county administers planning and building permits in unincorporated Madison County and applies applicable Indiana building-code and county development requirements. The fee schedule expressly lists accessory structures over 121 square feet as permit items; the reviewed official materials do not publish a complete minor/cosmetic exemption list. The county serves unincorporated areas and the Town of Orestes as its building commission jurisdiction.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.