Digital permit application gateway

Apply for a permit in Bartholomew County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

Residential guidance asks applicants to allow 3-5 days for permit review.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 812-379-1535 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Bartholomew County

Who handles permitting for this jurisdiction?

Columbus/Bartholomew County Department of Technical Code Enforcement is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 812-379-1535 and request the current application route before preparing a final submittal.

How long might review take?

Residential guidance asks applicants to allow 3-5 days for permit review.

How are inspections scheduled?

All inspections require 24-hour advance scheduling by calling 812-379-1535, generally by 4:30 p.m. the day before. Footing inspection is scheduled the prior day and confirmed by phone between 8:00-9:00 a.m. on inspection day; inspectors work between 9:00 a.m. and 4:00 p.m. Final inspection requires all fees and fines paid, and occupancy is prohibited before final approval.

Which codes and exemptions should I review?

Current Indiana codes listed by the department: 2014 Indiana Building Code (2012 IBC with Indiana amendments); 2020 Indiana Residential Code (2018 IRC with amendments); 2012 Indiana Plumbing Code (2006 IPC with amendments); 2009 Indiana Electrical Code (2008 NEC with amendments); 2014 Indiana Mechanical Code (2012 IMC with amendments); 2010 Indiana Energy Conservation Code; Indiana Swimming Pool Code; 2014 Indiana Fire Code (2012 IFC with amendments); and 2014 Indiana Fuel Gas Code (2012 IFGC with amendments). A permit is required before construction, alteration, or repair costing more than $300. Most improvements require permits, including buildings, sheds, garages, pools, decks, porches, remodeling, roofing, siding, windows, tanks, demolition, house moving, and signs. The department does not publish a broader cosmetic-work exemption list.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.