Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Broward County.

2023 Florida Building Code, effective December 31, 2023, with Broward County amendments and applicable county ordinances, resolutions, unsafe-structure/minimum-housing rules, and Florida elevator-safety requirements. The county’s Building Code Division enforces this framework in the Broward Municipal Services District (unincorporated county) and cities with which it contracts.

Inspection lane

Submit applications, plans, payments, and permit documents through Broward ePermits/ePermits OneStop; inspections can be scheduled online, and permit status is available by phone at (954) 765-4400 option 1 or by email to building@broward.org. A final inspection is required before closeout.

Minor-work playbook

Understand what may be exempt—and what is not.

The county requires permits for new construction and many alterations in its jurisdiction. Applicable Florida Building Code exemptions include portable heating, ventilation, and cooling equipment and replacement parts that do not alter approval or make equipment unsafe; specific exemptions must be checked against the current code and municipal rules. Incorporated Broward municipalities may apply their own permit exemptions and requirements.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Submit applications, plans, payments, and permit documents through Broward ePermits/ePermits OneStop; inspections can be scheduled online, and permit status is available by phone at (954) 765-4400 option 1 or by email to building@broward.org. A final inspection is required before closeout.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Broward County

Who handles permitting for this jurisdiction?

Broward County Building Code Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (954) 765-4400 option 1 for building permits; customer service (954) 831-4000.

How long might review take?

N/A; Broward publishes the ePermits workflow and office hours but no standard countywide plan-review timeline.

How are inspections scheduled?

Submit applications, plans, payments, and permit documents through Broward ePermits/ePermits OneStop; inspections can be scheduled online, and permit status is available by phone at (954) 765-4400 option 1 or by email to building@broward.org. A final inspection is required before closeout.

Which codes and exemptions should I review?

2023 Florida Building Code, effective December 31, 2023, with Broward County amendments and applicable county ordinances, resolutions, unsafe-structure/minimum-housing rules, and Florida elevator-safety requirements. The county’s Building Code Division enforces this framework in the Broward Municipal Services District (unincorporated county) and cities with which it contracts. The county requires permits for new construction and many alterations in its jurisdiction. Applicable Florida Building Code exemptions include portable heating, ventilation, and cooling equipment and replacement parts that do not alter approval or make equipment unsafe; specific exemptions must be checked against the current code and municipal rules. Incorporated Broward municipalities may apply their own permit exemptions and requirements.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.