Apply for a permit in Brevard County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the Accela permitting portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

No routine review timeline is published; in a declared emergency the county expects eligible permits that do not require technical review to be processed within 3 business days.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call (321) 633-2187; general Planning and Development (321) 633-2069 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Brevard County

Who handles permitting for this jurisdiction?

Brevard County Planning and Development Department, Building Code Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (321) 633-2187; general Planning and Development (321) 633-2069.

How long might review take?

No routine review timeline is published; in a declared emergency the county expects eligible permits that do not require technical review to be processed within 3 business days.

How are inspections scheduled?

Licensed contractors apply, upload documents, monitor status, pay fees, and schedule inspections through Brevard’s BASS/Accela portal. The county also supports VuSpex virtual inspections; qualifying virtual field reports are submitted through the VuSpex app or contractor portal and are not scheduled in advance. A recorded Notice of Commencement is required and must be uploaded and approved before inspections can be scheduled.

Which codes and exemptions should I review?

2023 Florida Building Code, Eighth Edition, confirmed on the current county building-permit application, together with applicable Florida Fire Prevention Code and Brevard County Code of Ordinances provisions. The county’s code-enforcement guidance says accessory structures such as sheds over 100 square feet require a permit, while ordinary minor work is governed by the Florida Building Code’s permit exemptions. The county recognizes owner-builder permitting for qualifying owner-occupied work, and the state code exemptions include portable heating, ventilation, and cooling appliances and replacement parts that do not alter approval or make equipment unsafe. Municipal building jurisdictions may impose their own rules.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.