Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Teller County.

Teller County Building Code effective July 1, 2023 adopts the 2021 International Residential Code, 2021 International Building Code, 2021 International Existing Building Code, 2021 International Plumbing Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2018 IECC replacement provisions, 2023 National Electrical Code, and a 2003 International Fire Code, with local amendments. Local design criteria include 57 psf ground snow load, 40 psf roof snow load, 115 MPH ultimate wind speed, and specified seismic criteria.

Inspection lane

Most contractor over-the-counter permits and inspections can be managed through the Teller/Pikes Peak public-access system; the contractor portal allows eligible electrical, mechanical, plumbing, and roofing contractors to schedule inspections. For general assistance call (719) 687-3048. The County code includes $100 reinspection and $100-per-hour after-hours inspection charges and may require engineer foundation inspections for specified projects.

Minor-work playbook

Understand what may be exempt—and what is not.

The County code exempts qualifying one-story conventional detached unheated sheds, playhouses, and greenhouses up to 200 square feet with limited overhangs and no habitable/sleeping use; qualifying membrane structures under 200 square feet used for residential/agricultural storage or vehicle shelter; solely agricultural buildings used for the agricultural classification of the property, not for residential storage, and meeting setbacks; and temporary membrane canopies/tents for residential events. Exempt agricultural structures must still follow current codes and separate trade permits may be required.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Most contractor over-the-counter permits and inspections can be managed through the Teller/Pikes Peak public-access system; the contractor portal allows eligible electrical, mechanical, plumbing, and roofing contractors to schedule inspections. For general assistance call (719) 687-3048. The County code includes $100 reinspection and $100-per-hour after-hours inspection charges and may require engineer foundation inspections for specified projects.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Teller County

Who handles permitting for this jurisdiction?

Teller County Community Development Department, Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Building Division/Community Development: (719) 687-3048; cdd@tellercounty.gov..

How long might review take?

N/A; no standard County plan-review timeline was published. Incomplete submittals are not accepted for review; permit extensions are available through a County application process.

How are inspections scheduled?

Most contractor over-the-counter permits and inspections can be managed through the Teller/Pikes Peak public-access system; the contractor portal allows eligible electrical, mechanical, plumbing, and roofing contractors to schedule inspections. For general assistance call (719) 687-3048. The County code includes $100 reinspection and $100-per-hour after-hours inspection charges and may require engineer foundation inspections for specified projects.

Which codes and exemptions should I review?

Teller County Building Code effective July 1, 2023 adopts the 2021 International Residential Code, 2021 International Building Code, 2021 International Existing Building Code, 2021 International Plumbing Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2018 IECC replacement provisions, 2023 National Electrical Code, and a 2003 International Fire Code, with local amendments. Local design criteria include 57 psf ground snow load, 40 psf roof snow load, 115 MPH ultimate wind speed, and specified seismic criteria. The County code exempts qualifying one-story conventional detached unheated sheds, playhouses, and greenhouses up to 200 square feet with limited overhangs and no habitable/sleeping use; qualifying membrane structures under 200 square feet used for residential/agricultural storage or vehicle shelter; solely agricultural buildings used for the agricultural classification of the property, not for residential storage, and meeting setbacks; and temporary membrane canopies/tents for residential events. Exempt agricultural structures must still follow current codes and separate trade permits may be required.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.