Fees, valuation & enforcement

Know the cost of authorization—and the cost of skipping it.

Permit fees are a project input. Enforcement exposure is a project risk. Use the official schedule where available, then confirm valuation, trade permits, plan review, and inspection charges with the Authority Having Jurisdiction.

Official fee pathway

Build the permit budget from the issuing agency’s schedule.

The final charge may depend on declared construction value, occupancy classification, square footage, plan review, state surcharges, trade permits, technology fees, and inspection activity. Do not use a neighboring city’s fee table as a substitute for this jurisdiction.

Fee desk contact

Building inspections/information: (970) 946-9031; Building Inspector/Code Enforcement Officer Bevan Harris: (970) 880-0387 direct; Town office (970) 387-5522; fax (970) 387-9920.

Ask the counter to confirm current charges before submitting a project with multiple trades or a change of use.

Financial exposure

Budget for the complete approval path.

Plan for building, mechanical, plumbing, electrical, fire, energy, zoning, septic, right-of-way, or other reviews that the project scope triggers. The lowest initial permit fee is not always the lowest project cost.

Enforcement exposure

Stop-work authority can interrupt the critical path.

When work begins without authorization, the agency may halt the site, require corrective plans, impose additional fees, withhold inspection release, or require concealed work to be exposed for review.

Closeout exposure

Unresolved work can block occupancy and utilities.

A missing final inspection or certificate can complicate occupancy, refinancing, sale, insurance, and utility connection. Preserve the approved plans and signed inspection record through closeout.

Professional field note

Treat every exemption as a narrow code exception, not a blanket waiver.

Even when a cosmetic or minor project does not require a building permit, zoning, floodplain, shoreline, historic, utility, fire, or right-of-way controls may still apply. Confirm the full jurisdictional picture before work starts.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for San Juan County

Who handles permitting for this jurisdiction?

San Juan County Building Division (shared building official with the Town of Silverton) is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Building inspections/information: (970) 946-9031; Building Inspector/Code Enforcement Officer Bevan Harris: (970) 880-0387 direct; Town office (970) 387-5522; fax (970) 387-9920..

How long might review take?

N/A; no standard plan-review or issuance timeline was published. New houses and major additions have a two-year permit expiration, with extensions potentially available for additional fees.

How are inspections scheduled?

Call (970) 946-9031 or the inspector at (970) 880-0387 with the permit number, legal description, job address, inspection type, permit name, and approximate requested time. A minimum of 24 hours advance notice is required. Required stages include footings, stem walls/slabs, rough trades and framing, sheathing, insulation, drywall fastening, final trade inspections, and final occupancy compliance inspection.

Which codes and exemptions should I review?

The official Building Department Requirements identify the 2015 IBC, IRC, IMC, IFGC, IECC, and IFC for the Town of Silverton/San Juan County building program, together with the latest National Electrical Code and Plumbing Code adopted by Colorado. Local requirements include 42-inch footing depth, 110-pound snow load (120 pounds above 10,000 feet), 110 MPH wind load, Seismic Design Category C, and specified insulation/roofing requirements; applicants must confirm later amendments with the Building Department. Improvement permits are required before building for projects over $2,000 including labor and materials or projects involving structural alterations. One-story detached accessory structures may be exempt depending on use and square footage, but the Building Official must be notified. No broad cosmetic-work exemption list was published; State electrical and commercial plumbing permits remain separately required where applicable.

Why permit costs vary

The fee is tied to the work, not just the form.

Building departments commonly calculate charges from valuation, occupancy, floor area, project type, plan review effort, trade scope, state surcharges, and inspection activity. A remodel that appears small on paper may still trigger structural, energy, fire, or utility review. Ask the permit counter which disciplines apply before you finalize the construction budget.

The same discipline applies to enforcement. Correcting unpermitted work after finishes are installed can require demolition, revised plans, additional inspections, and schedule disruption. Authorization is usually the less expensive project-management decision.