Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Clear Creek County.

2024 IRC, 2024 IBC, 2024 IPC, 2024 IMC, 2024 IFGC, 2024 International Energy Compliance Code, 2024 ISPSC, 2024 IEBC, 2024 IFC, and 2025 Colorado Wildfire Resiliency Code, adopted by Clear Creek County; local amendments and all adopted county requirements apply.

Inspection lane

Request building inspections at (303) 670-7534. For permits issued on or after Oct. 1, 2024, use the Clear Creek permitting platform account: My Profile > Permits > Inspections > Request an Inspection. Site-development rough-in and final inspection rules apply where grading, driveway, floodplain, or related work is involved; final site-development inspection is required before certificate of occupancy or completion.

Minor-work playbook

Understand what may be exempt—and what is not.

Zoning still applies to exempt work. Exemptions include one-story detached accessory sheds, playhouses, or similar structures up to 120 sq. ft.; fences up to 7 ft.; retaining walls up to 4 ft. unless supporting surcharge; certain on-grade water tanks up to 5,000 gallons; sidewalks; painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; prefabricated pools under 24 in. deep; swings/playground equipment; certain wall-mounted window awnings; detached residential decks up to 200 sq. ft. and 30 in. above grade when not attached to the dwelling or serving a required exit; non-permanent pole/fabric coverings; and certain pre-manufactured detached storage containers. Setbacks and planning review can still apply.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Request building inspections at (303) 670-7534. For permits issued on or after Oct. 1, 2024, use the Clear Creek permitting platform account: My Profile > Permits > Inspections > Request an Inspection. Site-development rough-in and final inspection rules apply where grading, driveway, floodplain, or related work is involved; final site-development inspection is required before certificate of occupancy or completion.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Clear Creek County

Who handles permitting for this jurisdiction?

Clear Creek County Planning and Building Services - Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (303) 679-2446; building inspection requests: (303) 670-7534; code questions: (303) 679-2346.

How long might review take?

N/A for general building review; Clear Creek site-development materials state an average 2-3 weeks for preliminary review and site-evaluation inspection where applicable.

How are inspections scheduled?

Request building inspections at (303) 670-7534. For permits issued on or after Oct. 1, 2024, use the Clear Creek permitting platform account: My Profile > Permits > Inspections > Request an Inspection. Site-development rough-in and final inspection rules apply where grading, driveway, floodplain, or related work is involved; final site-development inspection is required before certificate of occupancy or completion.

Which codes and exemptions should I review?

2024 IRC, 2024 IBC, 2024 IPC, 2024 IMC, 2024 IFGC, 2024 International Energy Compliance Code, 2024 ISPSC, 2024 IEBC, 2024 IFC, and 2025 Colorado Wildfire Resiliency Code, adopted by Clear Creek County; local amendments and all adopted county requirements apply. Zoning still applies to exempt work. Exemptions include one-story detached accessory sheds, playhouses, or similar structures up to 120 sq. ft.; fences up to 7 ft.; retaining walls up to 4 ft. unless supporting surcharge; certain on-grade water tanks up to 5,000 gallons; sidewalks; painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; prefabricated pools under 24 in. deep; swings/playground equipment; certain wall-mounted window awnings; detached residential decks up to 200 sq. ft. and 30 in. above grade when not attached to the dwelling or serving a required exit; non-permanent pole/fabric coverings; and certain pre-manufactured detached storage containers. Setbacks and planning review can still apply.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.