Apply for a permit in Shasta County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

The County's current general information states to allow approximately two weeks for an application to be completed after submittal, with longer processing for peak periods or extensive plan corrections. Minor projects may be approved within days; more complex projects vary by scope and required agency reviews.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call Building Division (530) 225-5761; 24-hour inspection request line (530) 244-5068; zoning hotline (530) 225-5184 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Shasta County

Who handles permitting for this jurisdiction?

Shasta County Department of Resource Management - Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Building Division (530) 225-5761; 24-hour inspection request line (530) 244-5068; zoning hotline (530) 225-5184.

How long might review take?

The County's current general information states to allow approximately two weeks for an application to be completed after submittal, with longer processing for peak periods or extensive plan corrections. Minor projects may be approved within days; more complex projects vary by scope and required agency reviews.

How are inspections scheduled?

Use the eTRAKiT/Build Shasta portal for eligible online permits and inspection information, or call the 24-hour inspection request line at (530) 244-5068. Required inspections must be scheduled and approved in sequence; no work may proceed beyond an inspection stage without written approval. Keep approved plans on site and provide access. Reinspection fees may apply when access, plans, or approved-plan compliance is not provided.

Which codes and exemptions should I review?

2025 California Building Standards Code, effective January 1, 2026, including the California Building Code and California Residential Code, together with applicable California electrical, plumbing, mechanical, energy, accessibility, fire, and green-building standards and Shasta County Building, Fire Safety, grading, and zoning ordinances. Shasta County's residential exemption handout lists one-story detached accessory structures up to 120 sq. ft. and 12 ft. to the ridge; fences up to 7 ft.; retaining walls up to 4 ft. measured from the bottom of the footing unless supporting a surcharge; grade-supported water tanks up to 5,000 gallons with a height-to-width/diameter ratio no greater than 2:1; sidewalks and driveways; painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; prefabricated pools less than 24 inches deep; swings/playground equipment; wall-supported window awnings projecting no more than 54 inches; and unattached decks up to 200 sq. ft. and 30 inches above grade that do not serve a required exit. Exemption does not authorize code- or ordinance-violating work and separate electrical, plumbing, zoning, fire, grading, or right-of-way approvals may still apply.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.