Apply for a permit in Fresno County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

For post-entitlement residential projects covered by California AB 2234, Fresno County must determine application completeness within 15 days and complete review within 30 days for projects of 25 or fewer units or 60 days for projects of 26 or more units. The county does not publish one universal timeline for all building permits; timing depends on project type, completeness, and required outside-agency clearances.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call (559) 600-4570 (plan check and permits); (559) 600-4560 (building inspection); (559) 600-4131 (24-hour inspection request line); (559) 600-4540 (zoning) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Fresno County

Who handles permitting for this jurisdiction?

County of Fresno Department of Public Works and Planning, Development Services and Capital Projects Division, Building & Safety is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (559) 600-4570 (plan check and permits); (559) 600-4560 (building inspection); (559) 600-4131 (24-hour inspection request line); (559) 600-4540 (zoning).

How long might review take?

For post-entitlement residential projects covered by California AB 2234, Fresno County must determine application completeness within 15 days and complete review within 30 days for projects of 25 or fewer units or 60 days for projects of 26 or more units. The county does not publish one universal timeline for all building permits; timing depends on project type, completeness, and required outside-agency clearances.

How are inspections scheduled?

Request inspections in the Fresno County Citizen Portal or call the 24-hour line at (559) 600-4131; requests must be called in by 2:30 p.m. the business day before the requested inspection day. Building Inspection can be reached at (559) 600-4560. Outlying-area inspection days vary by community, and inspection results are available in the portal for inspections after June 25, 2025.

Which codes and exemptions should I review?

The 2025 California Building Standards Code (Title 24) became effective January 1, 2026, including the California Administrative, Building, Residential, Electrical, Mechanical, Plumbing, Energy, Wildland-Urban Interface, Historical, Fire, Existing Building, and Green Building Standards Codes, plus Fresno County Ordinance Code Title 15 and applicable zoning, grading, fire-protection, accessibility, and local requirements. Fresno County adopts the California Building Code exemptions for one-story detached tool, storage, and playhouse accessory structures up to 120 square feet; fences up to 7 feet; oil derricks; retaining walls up to 4 feet unless surcharge or specified liquids apply; qualifying water tanks up to 5,000 gallons; qualifying sidewalks and driveways; painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; temporary stage sets; qualifying shallow above-ground pools; agricultural or nursery shade cloth; playground equipment; qualifying window awnings; and movable fixtures, cases, racks, counters, and partitions up to 5 feet 9 inches. Fresno County Title 15 also lists flagpoles and radio/TV antennas under 35 feet without receiving dishes, ground-mounted satellite dishes under 12 feet serving R-3 occupancy, transportable agricultural gypsum and fertilizer tanks, and certain detached one-story Group U accessory structures up to 240 square feet of floor/column area and 380 square feet of roof area. The larger local exemption requires a site plan, elevation sheet, operational statement, and owner-builder or contractor information through the portal.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.