Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Faulkner County.

Conway’s current official code sheet lists the 2021 Arkansas Fire Prevention Code, 2021 International Building Code, 2021 International Mechanical Code, 2020 National Electrical Code, 2018 Arkansas Plumbing and Gas Codes, 2017 ANSI, and 2014 Arkansas Energy Code. Faulkner County flood-hazard work must also comply with the County Flood Damage Prevention Resolution and applicable FEMA, state, and federal requirements.

Inspection lane

Conway inspections may be requested by phone, email, or through the Civic Access Portal; commercial inspections are scheduled for the next business day, and residential inspections must be called in at least one business day in advance. Contact 501-450-6107 or permits@conwayarkansas.gov. Faulkner County floodplain work requires a County Floodplain Administrator site inspection before slab pour or wall construction, plus a final elevation certificate and final compliance inspection.

Minor-work playbook

Understand what may be exempt—and what is not.

N/A. Conway requires permits for new construction, remodels, additions, accessory buildings, and separate electrical, plumbing, gas, and mechanical work; no general minor/cosmetic exemption list was published on the reviewed official pages.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Conway inspections may be requested by phone, email, or through the Civic Access Portal; commercial inspections are scheduled for the next business day, and residential inspections must be called in at least one business day in advance. Contact 501-450-6107 or permits@conwayarkansas.gov. Faulkner County floodplain work requires a County Floodplain Administrator site inspection before slab pour or wall construction, plus a final elevation certificate and final compliance inspection.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Faulkner County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 501-450-4900 (Faulkner County Judge Allen Dodson); 501-450-4935 (Faulkner County Floodplain Administrator); 501-450-6107 (Conway Building Permits & Inspections).

How long might review take?

Conway trade permits: 1–2 business days; residential permit review: up to 3–5 business days; commercial permit review: approximately 2–3 weeks, assuming complete plans and documents.

How are inspections scheduled?

Conway inspections may be requested by phone, email, or through the Civic Access Portal; commercial inspections are scheduled for the next business day, and residential inspections must be called in at least one business day in advance. Contact 501-450-6107 or permits@conwayarkansas.gov. Faulkner County floodplain work requires a County Floodplain Administrator site inspection before slab pour or wall construction, plus a final elevation certificate and final compliance inspection.

Which codes and exemptions should I review?

Conway’s current official code sheet lists the 2021 Arkansas Fire Prevention Code, 2021 International Building Code, 2021 International Mechanical Code, 2020 National Electrical Code, 2018 Arkansas Plumbing and Gas Codes, 2017 ANSI, and 2014 Arkansas Energy Code. Faulkner County flood-hazard work must also comply with the County Flood Damage Prevention Resolution and applicable FEMA, state, and federal requirements. N/A. Conway requires permits for new construction, remodels, additions, accessory buildings, and separate electrical, plumbing, gas, and mechanical work; no general minor/cosmetic exemption list was published on the reviewed official pages.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.