Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Crittenden County.

West Memphis’s current Building Inspections page lists the 2021 Arkansas Fire Prevention Code Volumes I (Fire), II (Building), and III (Residential); 2023 National Electrical Code; 2021 Arkansas Mechanical Code; 2018 Arkansas Plumbing and Gas Codes; 2014 Arkansas Energy Code; and 2012 Property Maintenance Code. The city is in Seismic Zone 3.

Inspection lane

West Memphis Building Inspections conducts inspections, issues permits, reviews plans, and validates licenses and insurance. The iWorQ portal supports permit searches, document uploads, and inspection requests; contact Planning & Development/Building Inspections at 870-732-7520 for the required inspection sequence and timing. Floodplain lots require a Flood Plain Development Application and Footing/Foundation Permit as additional submittals.

Minor-work playbook

Understand what may be exempt—and what is not.

N/A. West Memphis’s reviewed official building pages do not publish a general minor/cosmetic exemption list. The current residential application covers single-family, two-family, footing-only, new, and addition work and requires site, erosion-control, grading, floor, and framing information as applicable; confirm maintenance exemptions with Planning & Development before work begins.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    West Memphis Building Inspections conducts inspections, issues permits, reviews plans, and validates licenses and insurance. The iWorQ portal supports permit searches, document uploads, and inspection requests; contact Planning & Development/Building Inspections at 870-732-7520 for the required inspection sequence and timing. Floodplain lots require a Flood Plain Development Application and Footing/Foundation Permit as additional submittals.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Crittenden County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 870-739-3200 (Crittenden County Judge Woody Wheeless); 870-732-7520 (West Memphis Planning & Development/Building Inspections); 870-732-7521 (Planning & Development Director Mardis Jones).

How long might review take?

N/A. West Memphis requires the Building Official to inspect a property within a reasonable time after a completed application for a Certificate of Occupancy, but the reviewed permit pages do not publish a general building-plan review timeline.

How are inspections scheduled?

West Memphis Building Inspections conducts inspections, issues permits, reviews plans, and validates licenses and insurance. The iWorQ portal supports permit searches, document uploads, and inspection requests; contact Planning & Development/Building Inspections at 870-732-7520 for the required inspection sequence and timing. Floodplain lots require a Flood Plain Development Application and Footing/Foundation Permit as additional submittals.

Which codes and exemptions should I review?

West Memphis’s current Building Inspections page lists the 2021 Arkansas Fire Prevention Code Volumes I (Fire), II (Building), and III (Residential); 2023 National Electrical Code; 2021 Arkansas Mechanical Code; 2018 Arkansas Plumbing and Gas Codes; 2014 Arkansas Energy Code; and 2012 Property Maintenance Code. The city is in Seismic Zone 3. N/A. West Memphis’s reviewed official building pages do not publish a general minor/cosmetic exemption list. The current residential application covers single-family, two-family, footing-only, new, and addition work and requires site, erosion-control, grading, floor, and framing information as applicable; confirm maintenance exemptions with Planning & Development before work begins.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.