County Permit SearchU.S. compliance directory
← Craighead County overview

Digital permit application gateway

Apply for a permit in Craighead County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Jonesboro residential plan review: approximately 3-5 days from submission to Planning. Commercial review: approximately 5-15 days from submission to Planning, subject to Engineering, Fire Marshal, and Inspections sign-offs. County floodplain review time was not published.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call 870-933-4500 (Craighead County Judge Marvin Day); 870-932-0406 (Jonesboro Planning & Zoning); 870-933-4602 (Jonesboro Inspections) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Craighead County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 870-933-4500 (Craighead County Judge Marvin Day); 870-932-0406 (Jonesboro Planning & Zoning); 870-933-4602 (Jonesboro Inspections).

How long might review take?

Jonesboro residential plan review: approximately 3-5 days from submission to Planning. Commercial review: approximately 5-15 days from submission to Planning, subject to Engineering, Fire Marshal, and Inspections sign-offs. County floodplain review time was not published.

How are inspections scheduled?

For Jonesboro, email inspections2@jonesboroAR.gov with a description of the requested inspection. The development guide says requests called in by 4:00 p.m. are generally inspected the following day, with some footing/rough-in, gas, and residential-reconnect inspections handled as soon as possible. Contact Chief Building Official Tim Renshaw’s department at 870-933-4602. County floodplain work requires the Craighead County Floodplain Administrator’s review, inspection, and compliance certificate before occupancy or use.

Which codes and exemptions should I review?

Jonesboro lists the 2021 Existing Building Code; 2021 Arkansas Fire Prevention Code Volumes I (Fire), II (Building), and III (Residential); 2018 Arkansas Plumbing and Fuel Gas Codes; 2021 International Mechanical Code; 2020 National Electrical Code; 2014 Arkansas Energy Code; and 2003 ICC/ANSI A117.1 accessibility standards. Craighead County’s current materials also require county floodplain-development permitting where applicable. Jonesboro states that permits are required for work that is not maintenance or cosmetic. Its examples requiring permits include new garages, sheds, accessory buildings, roofed decks, houses, remodeling/alterations, and roof, window/door, or siding work; routine maintenance and cosmetic work are the stated exemption category. A new fence requires a permit.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.