County Permit SearchU.S. compliance directory
← Boone County overview

Digital permit application gateway

Apply for a permit in Boone County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A for ordinary permit review. Harrison’s application requires non-residential plan packages to be filed 21 days before the next regular Planning Commission meeting when the project meets the stated size/site thresholds; inspection timing depends on the city schedule and required notice.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 870-741-5760 (Boone County Judge); 870-741-6384 (Harrison Community Risk Reduction/Fire Department); 870-741-3434 (Harrison City Engineer/planning) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Boone County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 870-741-5760 (Boone County Judge); 870-741-6384 (Harrison Community Risk Reduction/Fire Department); 870-741-3434 (Harrison City Engineer/planning).

How long might review take?

N/A for ordinary permit review. Harrison’s application requires non-residential plan packages to be filed 21 days before the next regular Planning Commission meeting when the project meets the stated size/site thresholds; inspection timing depends on the city schedule and required notice.

How are inspections scheduled?

Harrison permit applications are submitted to the Community Risk Reduction Division at 118 Industrial Park Road or through its online permit page. Inspection requests must be made at least 24 hours in advance; requests with less notice are treated as emergency inspections and may incur additional fees. The city also requires a Certificate of Occupancy inspection for a new business, change of location, or change of ownership.

Which codes and exemptions should I review?

No current countywide building-code edition was identified because Boone County’s Chapter 13 Article I (Building) is reserved. The City of Harrison publishes the 2021 IFC/Arkansas Fire Prevention Code Volumes I-III, 2021 International Building Code, 2021 Mechanical Code, 2020 Electrical Code, 2018 Plumbing Code, and 2018 Fuel & Gas Code for projects within the city. N/A countywide. Boone County does not publish a county building-permit exemption list. Harrison’s Community Risk Reduction division reviews new commercial and residential construction, additions/remodels, decks, and storage buildings; applicants should confirm any minor-work exemption directly with the city or the municipality where the project is located.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.