Digital permit application gateway

Apply for a permit in Madison County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Commercial plan review: typically 2-6 weeks for initial responses. The county targets next-business-day inspections in most cases; residential Certificate of Occupancy processing is within 2 business days after final requirements are complete.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call (256) 746-2950; inspection@madisoncountyal.gov if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Madison County

Who handles permitting for this jurisdiction?

Madison County Building and Fire Inspection Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (256) 746-2950; inspection@madisoncountyal.gov.

How long might review take?

Commercial plan review: typically 2-6 weeks for initial responses. The county targets next-business-day inspections in most cases; residential Certificate of Occupancy processing is within 2 business days after final requirements are complete.

How are inspections scheduled?

Apply, pay, and request inspections through CityView, or request by email/phone. Requests must be received by 2:00 PM one business day before the desired inspection date; later requests are not scheduled for the next business day. Typical residential stages include footing/foundation, framing, under-slab plumbing, rough-ins, energy compliance, temporary power and final. A Certificate of Occupancy is issued within 2 business days after all required inspections and documents pass.

Which codes and exemptions should I review?

Madison County enforces the 2018 International Building, Residential, Existing Building, Mechanical, Plumbing, Fuel Gas, Swimming Pool & Spa and Fire Codes; 2017 National Electrical Code; 2018 NFPA Life Safety Code; and the state-mandated 2015 International Energy Conservation Code. Residential work uses the 2018 IRC with local amendments under the 2021 Residential Construction Resolution. The county’s current inspection page refers applicants to its Residential Construction Resolution for exceptions. The verified residential guidance states permits are required for new homes; work costing $1,000 or more; septic/plumbing-line changes; main-power work; gas work; mechanical-unit replacement; manufactured-home setup; pools/spas 24 inches or deeper; and roofing/re-roofing. Minor work below the applicable thresholds may be exempt, but the current resolution should be checked for the complete list.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.