Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Baldwin County.

2024 International Building Code with amendments; 2024 International Residential Code with amendments; 2024 International Mechanical Code; 2024 International Plumbing Code with amendments; 2024 International Fuel Gas Code; 2018 International Energy Conservation Code with amendments; 2023 National Electrical Code with amendments; and 2025 Baldwin County Building Code Modifications.

Inspection lane

Request inspections in CitizenServe: My Account > View My Requests > View My Bldg Dept > select the permit > Request an Inspection. Same-day requests are not accepted. Alternatively call 251-972-6837 during business hours; requests are not accepted by voicemail or email. Reports are emailed and posted in the portal.

Minor-work playbook

Understand what may be exempt—and what is not.

Residential decks do not require a permit when detached, no more than 200 square feet, no more than 30 inches above grade, and not serving the required exit door. Outside flood zones, one-story detached accessory structures generally do not require a permit when they are no more than 200 square feet on a property with an existing primary residence, or no more than 120 square feet when serving an existing multifamily/commercial building. Manufactured-home roofing, HVAC, plumbing and interior alterations are outside the county's permit/inspection scope. Owner-builder licensing exemptions may apply, but permits are still required.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Request inspections in CitizenServe: My Account > View My Requests > View My Bldg Dept > select the permit > Request an Inspection. Same-day requests are not accepted. Alternatively call 251-972-6837 during business hours; requests are not accepted by voicemail or email. Reports are emailed and posted in the portal.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Baldwin County

Who handles permitting for this jurisdiction?

Baldwin County Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 251-972-6837.

How long might review take?

Residential trade permits and residential re-roofing: usually 1-2 business days. All other complete permit applications: usually 7-10 business days.

How are inspections scheduled?

Request inspections in CitizenServe: My Account > View My Requests > View My Bldg Dept > select the permit > Request an Inspection. Same-day requests are not accepted. Alternatively call 251-972-6837 during business hours; requests are not accepted by voicemail or email. Reports are emailed and posted in the portal.

Which codes and exemptions should I review?

2024 International Building Code with amendments; 2024 International Residential Code with amendments; 2024 International Mechanical Code; 2024 International Plumbing Code with amendments; 2024 International Fuel Gas Code; 2018 International Energy Conservation Code with amendments; 2023 National Electrical Code with amendments; and 2025 Baldwin County Building Code Modifications. Residential decks do not require a permit when detached, no more than 200 square feet, no more than 30 inches above grade, and not serving the required exit door. Outside flood zones, one-story detached accessory structures generally do not require a permit when they are no more than 200 square feet on a property with an existing primary residence, or no more than 120 square feet when serving an existing multifamily/commercial building. Manufactured-home roofing, HVAC, plumbing and interior alterations are outside the county's permit/inspection scope. Owner-builder licensing exemptions may apply, but permits are still required.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.